The cost to build an ADU in Southern California varies by location, available space, personal preferences and more.

What is the Cost to build an
Accessory Dwelling Unit?

Granny Flats
9e6c39_f0.jpeg
Backyard Offices
Garage Conversions

Understanding the cost to build an ADU
in Southern California

Build a Single Family Home |$637,000+

Build a Backyard ADU |$117,500+

If you are thinking about building an ADU, you have no doubt learned that the median home prices in Southern California are astronomical! Highest as of 2021 Orange County: $1,120,000. Lowest: San Bernardino County: $445,000 Many Residents are looking at their options when their family dynamics change and they need new solutions for comfortable living arrangements. When you consider how costly it is to build a new single family home these days, the idea of building an ADU becomes much more appealing when you can do it for a fraction of the cost!

Baseline costs to build an ADU or Granny Flat

AVERAGE ADU COST

The following numbers are approximations. Once we have an understanding of your location, design, fixtures and other factors, we can then be more definitive. There are multiple factors that dictate the cost of your build. This can include, but not limited to the unstable building materials industry and the city of your build. 

SoCal-ADUPros will 100% do what’s necessary to ensure you receive the best pricing without compromising craftsmanship or value. As long as there are no extenuating circumstances, Client can expect approximately, $235-$300 per SF 

⭐️ SCHEDULE A FREE CONSULTATION WITH YOUR PERSONAL ADU EXPERT BY CLICKING THIS LINK:

*Costs are subject to fluctuate due to the volatile materials and supplies market. The day of contract signing secures pricing.

CLICK HERE TO TOUR ONE OF OUR STANDARD ADU BUILDS:

https://youtu.be/mHDnfKoYzlg

DESIGN • PLANS • PLAN EXPEDITING SERVICES

    •    Total Cost of design, plans and plan expediting process management range from $8500-$9750+ per unit depending on size of project.
   •    30% required upon Client’s execution of agreement.
   •    50% required upon reviewing of completed floor plans and Client approving them. Working plans/construction plans phase will begin for submission to the jurisdiction for approval.
   •    $20% Required upon completed approved working plans from the City.

The above fees are for typical for a one unit standard project. In the event your project has multiple units, additional tasks or extenuating circumstances, you will be made aware of the additional costs and fully educated on those points prior to any payments being made. (Costs include Floor Plans, Working/Construction Plans & Plan Approval Process Management Travel cost & meetings with the City).

Plans Include: Site Plan/Floor Plan, Working/Construction Plans, Elevations, Sections and Roof Plan -Electrical Plan, Mechanical Plan, Plumbing Plan as required, -Title 24, Structural Foundation, Framing, Roof Framing with CALCS

 

ADU CONSTRUCTION PRICING 

WRITTEN QUOTE SOLIDIFIES PRICE PER SF. 

DETATCHED/ATTACHED ADU APPROXIMATE COSTS:

1 Bedroom ADU 500 Sq Ft:
$122,500 (Riverside & San Bernardino Counties) $245 Per SF
$137,500 (Los Angeles, Orange, and San Diego Counties) $275 Per SF 

2 Bedroom ADU 750 Sq Ft:
$183,750 (Riverside & San Bernardino Counties) $245 Per SF
$206,250 (Los Angeles, Orange, and San Diego Counties) $275 Per SF

GARAGE CONVERSION:

2 Car Garage 400 Sq Ft:
$88,000 (Riverside & San Bernardino Counties) $220 Per SF 
$94,000 (Los Angeles, Orange, and San Diego Counties) $235 Per SF

 

3 Car Garage 600 Sq Ft:
$135,000 (Riverside & San Bernardino Counties) $220 Per SF 
$141,000 (Los Angeles, Orange, and San Diego Counties) $235 Per SF

The following video of an ADU we completed gives you an idea of finishes you can anticipate in the $235-$300+ sq ft price range: https://youtu.be/mHDnfKoYzlg Location, finishes, market conditions and specifics of your project will be the determining factor. Construction takes 4-6 months.

The turn key ADU construction and price per square foot will consist of completing all phases of construction, foundation, framing, plumbing, electrical, insulation, mechanical, windows & doors, complete sign off of all inspections and final from City, separate sub panel when applicable, complete interior painting, new flooring, new plumbing for kitchen and bath, new kitchen cabinets, counter tops, faucets, sink and hardware, bathroom will have new flooring, toilet, vanity, mirror, plumbing, electrical, sink faucets, shower heads, shower & tub as seen in above video, install mini split HVAC system, install attic insulation.

Appliances, Landscaping, Plans and Permits fees, City fees, Engineering, Deputy Inspector Fees, Title 24 fees, any and all fees other than materials and labor will be paid by the Client.

PERMIT FEES PAID TO THE CITY:

All City offices required different fees depending on the project. For example, some City entities require a $3500 deposit that they will subtract fees throughout the process. At the end of the process you complete documentation for them to return the remaining balance. Based on our experience, on average, fees will range from $1500-$2500 per review per unit being built. We can be more definitive upon starting your project. (SoCal ADU Pros do not control these fees. Each City is different with their process and fee schedule.)

* We suggest to all clients that they let us know their budget. Once we have an understanding of your budget, we can then give you the best value for your budget.

* The cost to build ADU’S varies largely, depending upon personal preferences, allowable space, utilities and permits.

* Save yourself some time and money, have one of our expert Team Members evaluate your needs and give you an accurate assessment.

⭐️ SCHEDULE A FREE CONSULTATION WITH YOUR PERSONAL ADU EXPERT BY CLICKING THIS LINK:  

HELPFUL TIPS

Multiple inspections are required until the project is finished. If one of your inspections fails, you have to apply for a new permit and pay the fees again.

[SoCal-ADUPros won’t let this happen.]

*Southern California permits all have expiration dates. If your project falls off of the timeline for any reason, you will be required to apply for another permit and pay the fees again.[SoCal-ADUPros won’t let this happen.]

*Hiring multiple contractors like an architect, a designer and construction crew to build your project is the fastest way to blow your ADU construction costs off the chart. This method creates delays, mistakes, miscommunication, failed inspections and unnecessary costs.

*SoCal-ADUPros is a One-Stop, Full Service experience. We are a complete team. Designers, Architects and Construction crews all under one roof. We take care of EVERYTHING including obtaining permits and coordinating inspections. Our Crew has been working together for over years and we are a finely tuned machine. We greatly reduce your exposure to the list of UNexpected, UNnecessary costs.

EXPECTED COSTS

Licenses and Building Codes

Utility Fees and Taxes

Plan Reviews

Permit Fees

School Fees

Impact Fees (If you build over 750 sq ft.)

UNEXPECTED COSTS

*when you choose the wrong builder

City-Required property upgrades

Failed Inspections

Expired Permits / New Applications

Expedited Permits

After-Hour Inspections

[You can expect SoCal-ADUPros to avoid unexpected costs.]

c2a80f3 (1).jpg

Can you build an ADU? Find out.

Connect with the SoCal-ADUPros Team today.
We're ready to help.

bottom of page